PROJECTS

Cost effective innovation

Case study

TECHNOLOGY IMPLEMENTATION HELP TO INCREASE 30% NUMBER OF BUILDING STORIES

TECHNOLOGY IMPLEMENTATION HELP TO INCREASE 30% NUMBER OF BUILDING STORIES

Normal slab was used at first but after consulting with our expert both owner and architect decided to adopt our solution. As our solution saved 20% construction cost and reduced the building’s height, so that the ower decided to raise 3 more stories from 9 to 12 stories.
 
Scale : 12 stories
Location : Nha Trang, Khánh Hòa
Scope of work : structural design
Finished time: 2016
status: constructing
 
SAVE 20% CONSTRUCTING COST FOR APARTMENT BUILDING

SAVE 20% CONSTRUCTING COST FOR APARTMENT BUILDING

This was our special case, cause the owner hired 3 different design companies 
The first company, HAAI, designed nomal slab
The second company, VITEC, designed bubble slab which was slightly more economical that normal slab, the floor’s price was 24 billion VND 
The third company, ACH, designed hollow slab which costs 19 billions VND, 20% less than bubble slab (5 billions VND)
Scale : 21 stories, 1 basement 
Location : Vinh, Nghệ An
Scope of work: structural design and construction consultant
Finished time : 2016
 
SAVE 20% CONSTRUCTION COST FOR OFFICE BUILDING

SAVE 20% CONSTRUCTION COST FOR OFFICE BUILDING

The building’s span was 9 meters, saved 20% construction cost for the owner. Because of light self -weigh our solution helps to save 10% foundation’s cost, creates a unique floor system, reduce finishing work which save more money for the owner.  

Scale: 2 stories
Location:  Sóc Sơn, Hà Nội
Scope of work : structural design
Finished time: 2015
status: in use
 
12 METERS SPAN, SAVE 15% CONSTRUCTION COST.

12 METERS SPAN, SAVE 15% CONSTRUCTION COST.

The building span was 12 meters and the liveload was 6 times higher than that of residental house.   
Our solution was 15% more economical that normal slab
 
Scale : 4 stories, 18400 m2 of floor area
Location: Hà Nội
Scope of work: Feasibility study, architectural design, structural design, supervision consultant. 
Finished Time : 2014
Status: in use
 

TESTIMONIALS

Mr. Chen Yi Kuang
Mr. Chen Yi Kuang
CEO Viet Energy LTD

Mr. Nguyen advised us to use the waffle floor which help increase the structure spans up to 12 m and increase the maximum live-load bearing up to 1000 kg/ m2. This design solution reduces the concrete and steel input that makesthe construction cost drops much lower than other provided solutions.

We sincerely thank ACH Consulting Co., Ltd for providing good and reliable service. If you want to carry out a complex projects with high requirements, you may consider working with ACH Consulting.

 

Mr. Nguyen Duc Chi
Mr. Nguyen Duc Chi
Binh Dinh Procuracy’ s President.

The floor plan saves more than 20% of the structural cost, saving the foundation’s cost in comparison with other conventional structural designs.

ACH Consulting Corporation represents the spirit of responsibility, serious and creative in the design process. I choose ACH Consulting Corporation is a strategic partner in long term